ADC3241EVM

Mfr. #: ADC3241EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE ADC3241
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADC3241EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3241EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 25M. Data-Interface: LVDS - Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC3241 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3241 evaluation module. This tool is designed for the ADC3241. Serial LVDS interface type

ADC3241EVM Image

ADC3241EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3241EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 25M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3241
  • Power-Typ-Conditions 118mW @ 25MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function ADC3241 evaluation module
  • Tool-Is-For-Evaluation-Of ADC3241
  • Interface-Type Serial LVDS

ADC3241EVM

ADC3241EVM Specifications

ADC3241EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 25M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Serial

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADC3241.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed ADC3241 evaluation module

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADC3241.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Serial LVDS.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
448,50 USD
448,50 USD
10
426,08 USD
4 260,75 USD
100
403,65 USD
40 365,00 USD
500
381,22 USD
190 612,50 USD
1000
358,80 USD
358 800,00 USD
Top