XTR108EVM

Mfr. #: XTR108EVM
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools XTR108 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: XTR108EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
XTR108EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Voltage to Current Converters type. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

XTR108EVM Image

XTR108EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

XTR108EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Type: Voltage to Current Converters
  • Tool Is For Evaluation Of: XTR108
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

XTR108EVM

XTR108EVM Specifications

XTR108EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage to Current Converters.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top