VCA5807EVM

Mfr. #: VCA5807EVM
Produttore: Texas Instruments
Descrizione: Amplifier IC Development Tools VCA5807 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: VCA5807EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA5807EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Instrumentation Amplifiers type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with VCA5807. Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

VCA5807EVM Image

VCA5807EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA5807EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Instrumentation Amplifiers
  • Tool Is For Evaluation Of: VCA5807
  • Series: VCA5807
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: VCA5807
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

VCA5807EVM

VCA5807EVM Specifications

VCA5807EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Instrumentation Amplifiers.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is VCA5807.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top