UCC28950EVM-442

Mfr. #: UCC28950EVM-442
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools 600WPh-ShiftedFull Bridge Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: UCC28950EVM-442 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC28950EVM-442 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the AC/DC Converters type. 370 V to 410 V Input Voltage Output Voltage is 12 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.066 lbs of Unit Weight

UCC28950EVM-442 Image

UCC28950EVM-442

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC28950EVM-442 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: AC/DC Converters
  • Tool Is For Evaluation Of: UCC28950
  • Input Voltage: 370 V to 410 V
  • Output Voltage: 12 V
  • Series: UCC28950
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 2.066 lbs

UCC28950EVM-442

UCC28950EVM-442 Specifications

UCC28950EVM-442 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is AC/DC Converters.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 370 V to 410 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 12 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 2.066 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top