UC385EVM-207

Mfr. #: UC385EVM-207
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools UC385-207 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: UC385EVM-207 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UC385EVM-207 Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

UC385EVM-207 Image

UC385EVM-207

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UC385EVM-207 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: UCx82-x and UCx85-x
  • Series: UC385
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

UC385EVM-207

UC385EVM-207 Specifications

UC385EVM-207 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top