TSW3085EVM

Mfr. #: TSW3085EVM
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools TSW3085 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TSW3085EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW3085EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the DAC type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW3085EVM Image

TSW3085EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW3085EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: DAC
  • Tool Is For Evaluation Of: TSW308x
  • Packaging: Bulk
  • Series: TSW3085
  • Brand: Texas Instruments
  • Interface Type: Serial
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW3085EVM

TSW3085EVM Specifications

TSW3085EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Serial.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top