TSW3070EVM

Mfr. #: TSW3070EVM
Produttore: Texas Instruments
Descrizione: Data Conversion IC Development Tools TSW3070 Hi Sp DAC
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TSW3070EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW3070EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 2.8 V to 3.8 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW3070EVM Image

TSW3070EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW3070EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC5682Z, THS3095
  • Operating Supply Voltage: 2.8 V to 3.8 V
  • Series: TSW3070
  • Brand: Texas Instruments
  • Interface Type: SMA, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW3070EVM

TSW3070EVM Specifications

TSW3070EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.8 V to 3.8 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SMA, USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top