TSC2006EVM-PDK

Mfr. #: TSC2006EVM-PDK
Produttore: Texas Instruments
Descrizione: Touch Sensor Development Tools TSC2006EVM-PDK Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TSC2006EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2006EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the Resistive Touch Sensor type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Touch Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TSC2006EVM-PDK Image

TSC2006EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2006EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Touch Sensor Development Tools
  • RoHS: E
  • Product: Evaluation Kits
  • Type: Resistive Touch Sensor
  • Tool Is For Evaluation Of: TSC2006
  • Operating Supply Voltage: 3.3 V
  • Brand: Texas Instruments
  • Product Type: Touch Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSC2006EVM-PDK

TSC2006EVM-PDK Specifications

TSC2006EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: At what frequency does the Type?

    Q: The product Type is Resistive Touch Sensor.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Touch Sensor Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top