| Mfr. #: | TS3A227E-EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Switch IC Development Tools TS3A227E Evaluation Module |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TS3A227E-EVM Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Audio Switches type. Texas Instruments is a trusted brand for quality electronics Switch IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.077907 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TS3A227E-EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Audio Switches.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is Switch IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.077907 oz.