TRF37C75EVM

Mfr. #: TRF37C75EVM
Produttore: Texas Instruments
Descrizione: RF Development Tools Evaluation Module
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TRF37C75EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37C75EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF37C75EVM Image

TRF37C75EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37C75EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: Y
  • Series: TRF37C75
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF37C75EVM

TRF37C75EVM Specifications

TRF37C75EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is RF Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top