TRF3750T-1900EVM

Mfr. #: TRF3750T-1900EVM
Produttore: Texas Instruments
Descrizione: RF Development Tools TRF3750T-1900 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TRF3750T-1900EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF3750T-1900EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the RF Synthesizers type. Frequency range: 1.9 GHz to 2.4 GHz 3.3 V, 5 V operating supply voltage range Dimensions of 4 in x 3.4 in x 0.062 in Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF3750T-1900EVM Image

TRF3750T-1900EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3750T-1900EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: RF Synthesizers
  • Tool Is For Evaluation Of: TRF3750
  • Frequency: 1.9 GHz to 2.4 GHz
  • Operating Supply Voltage: 3.3 V, 5 V
  • Description/Function: Provides a platform for evaluating the TRF3750 integer-N PLL frequency synthesizer under various signals, reference, and supply conditions
  • Dimensions: 4 in x 3.4 in x 0.062 in
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF3750T-1900EVM

TRF3750T-1900EVM Specifications

TRF3750T-1900EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed RF Synthesizers

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 1.9 GHz to 2.4 GHz.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V, 5 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 4 in x 3.4 in x 0.062 in

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo