| Mfr. #: | TPS92513EVM-001 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | LED Lighting Development Tools TPS92513 Eval Module |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS92513EVM-001 Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules Compatible with TPS92513. This product's TPS92513 is an ARM Cortex M3. 6 V to 24 V operating supply voltage range Output current: 1 A Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS92513EVM-001 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the For Use With of the product?
Q: The For Use With of the product is TPS92513.
A: At what frequency does the Core?
Q: The product Core is TPS92513.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 6 V to 24 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 1 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is LED Lighting Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.