| Mfr. #: | TPS7B6850EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools TPS7B6850EVM |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS7B6850EVM Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 4 V to 40 V Input Voltage Output Voltage is 5 V Output current: 500 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.745 lbs of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B6850EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is LDO Voltage Regulators.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 4 V to 40 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 5 V
A: At what frequency does the Output Current?
Q: The product Output Current is 500 mA.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 1.745 lbs