| Mfr. #: | TPS7A8101EVM-093 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools TPS7A8101 Eval Mod |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS7A8101EVM-093 Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 2.2 V to 6.5 V Input Voltage Output Voltage is 1.8 V, 2.5 V, 2.8 V, 3.3 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.159322 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7A8101EVM-093 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is LDO Voltage Regulators.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 2.2 V to 6.5 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 1.8 V, 2.5 V, 2.8 V, 3.3 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 1 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.159322 oz.