TPS657095EVM-122

Mfr. #: TPS657095EVM-122
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS657095EVM-122
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS657095EVM-122 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS657095EVM-122 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 6 V Input Voltage Output current: 75 mA Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.146632 oz of Unit Weight

TPS657095EVM-122 Image

TPS657095EVM-122

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS657095EVM-122 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS657095
  • Input Voltage: 6 V
  • Description/Function: Power management solution for embedded camera modules
  • Output Current: 75 mA
  • Series: TPS657095
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.146632 oz

TPS657095EVM-122

TPS657095EVM-122 Specifications

TPS657095EVM-122 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed PMIC Solutions

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 6 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 75 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.146632 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top