| Mfr. #: | TPS65288EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools TPS65288 EVAL MOD |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS65288EVM Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. 4.5 V to 18 V Input Voltage Output Voltage is 1.2 V to 3.3 V Output current: 2 A, 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS65288. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65288EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed PMIC Solutions
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 4.5 V to 18 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 1.2 V to 3.3 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 2 A, 3 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the For Use With of the product?
Q: The For Use With of the product is TPS65288.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.