TPS65281-1EVM

Mfr. #: TPS65281-1EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS65281-1 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS65281-1EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65281-1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics Compatible with TPS65218-1. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.179993 oz of Unit Weight

TPS65281-1EVM Image

TPS65281-1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65281-1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS65218-1
  • Series: TPS65281-1
  • Brand: Texas Instruments
  • For Use With: TPS65218-1
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.179993 oz

TPS65281-1EVM

TPS65281-1EVM Specifications

TPS65281-1EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS65218-1.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.179993 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top