| Mfr. #: | TPS65235-1EVM-694 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools TPS65235-1EVM-694 |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS65235-1EVM-694 Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 16 V Input Voltage Output Voltage is 13 V, 18 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65235-1EVM-694 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Voltage Regulators - Switching Regulators.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 4.5 V to 16 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 13 V, 18 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 1 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools