TPS62140EVM-505

Mfr. #: TPS62140EVM-505
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS62140 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS62140EVM-505 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62140EVM-505 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 3.7 V to 17 V Input Voltage Output Voltage is 3.327 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS62140. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS62140EVM-505 Image

TPS62140EVM-505

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62140EVM-505 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62140
  • Input Voltage: 3.7 V to 17 V
  • Output Voltage: 3.327 V
  • Description/Function: 2A, synchronous, step-down converter in a 3x3 mm, 16-pin QFN package
  • Output Current: 2 A
  • Series: TPS62140
  • Brand: Texas Instruments
  • For Use With: TPS62140
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS62140EVM-505

TPS62140EVM-505 Specifications

TPS62140EVM-505 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3.7 V to 17 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 3.327 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TPS62140.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top