TPS61372EVM-033

Mfr. #: TPS61372EVM-033
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools CREATE EVM FOR DEVICE TPS61372
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS61372EVM-033 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61372EVM-033 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.5 V to 5 V Input Voltage Output Voltage is 12 V Output current: 600 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS61372EVM-033 Image

TPS61372EVM-033

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61372EVM-033 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS61372
  • Input Voltage: 2.5 V to 5 V
  • Output Voltage: 12 V
  • Output Current: 600 mA
  • Series: TPS61372
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS61372EVM-033

TPS61372EVM-033 Specifications

TPS61372EVM-033 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.5 V to 5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 12 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 600 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

16 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top