TPS562209EVM-601

Mfr. #: TPS562209EVM-601
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS562209EVM-601
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS562209EVM-601 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS562209EVM-601 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 17 V Input Voltage Output Voltage is 1.05 V Output current: 0 A to 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.017936 oz of Unit Weight

TPS562209EVM-601 Image

TPS562209EVM-601

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS562209EVM-601 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS562209
  • Input Voltage: 4.5 V to 17 V
  • Output Voltage: 1.05 V
  • Output Current: 0 A to 2 A
  • Series: TPS562209
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.017936 oz

TPS562209EVM-601

TPS562209EVM-601 Specifications

TPS562209EVM-601 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4.5 V to 17 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.05 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 0 A to 2 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.017936 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top