TPS549B22EVM-847

Mfr. #: TPS549B22EVM-847
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS549B22EVM-847
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS549B22EVM-847 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS549B22EVM-847 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Linear Voltage Regulators type. 12 V Input Voltage Output Voltage is 1 V Output current: 25 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko. 1. 0.384811 oz of Unit Weight

TPS549B22EVM-847 Image

TPS549B22EVM-847

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS549B22EVM-847 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Linear Voltage Regulators
  • Tool Is For Evaluation Of: TPS549B22
  • Input Voltage: 12 V
  • Output Voltage: 1 V
  • Description/Function: Demonstrates the TPS549B22 in a typical low-voltage application
  • Output Current: 25 A
  • Series: TPS549B22
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT
  • Unit Weight: 0.384811 oz

TPS549B22EVM-847

TPS549B22EVM-847 Specifications

TPS549B22EVM-847 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Linear Voltage Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 12 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 25 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Tradename?

    Q: The product Tradename is SWIFT.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.384811 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top