TPS54386EVM

Mfr. #: TPS54386EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS54386 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS54386EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54386EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 12 V Input Voltage Output Voltage is 5 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko.

TPS54386EVM Image

TPS54386EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54386EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS54386
  • Input Voltage: 12 V
  • Output Voltage: 5 V
  • Series: TPS54386
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT

TPS54386EVM

TPS54386EVM Specifications

TPS54386EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 12 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SWIFT.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top