| Mfr. #: | TPS54360EVM-182 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools TPS54360 EVAL MOD |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS54360EVM-182 Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 60 V Input Voltage Output Voltage is 5 V Output current: 3.5 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS54360. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54360EVM-182 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Power Management Specialized.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 60 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 5 V
A: At what frequency does the Output Current?
Q: The product Output Current is 3.5 A.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the For Use With of the product?
Q: The For Use With of the product is TPS54360.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.