| Mfr. #: | TPS40090EVM-002 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools TPS40090-002 Eval Mod |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS40090EVM-002 Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 1.5 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40090EVM-002 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: What is the Type of the product?
Q: The Type of the product is Switching Controllers.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 12 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 1.5 V
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.