| Mfr. #: | TPS2HA08AQ1EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS2HA08AQ1EVM Scheda dati |


This product is manufactured by Texas Instruments. The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2HA08AQ1EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Qualification?
Q: Yes, the product's Qualification is indeed AEC-Q100
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Tradename?
Q: Yes, the product's Tradename is indeed SIMPLE SWITCHER