| Mfr. #: | TPS2543EVM-064 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Power Management IC Development Tools TPS2543 Eval Mod |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS2543EVM-064 Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB The product can operate at a maximum temperature of + 125 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 8.818490 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2543EVM-064 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Load Switches.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 125 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 8.818490 oz.