TPS2493EVM-004

Mfr. #: TPS2493EVM-004
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS2493 Hot Swap ontroller Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS2493EVM-004 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2493EVM-004 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Hot Swap Voltage Controllers type. 12 V, 48 V Input Voltage Output Voltage is 12 V, 48 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.320005 oz of Unit Weight

TPS2493EVM-004 Image

TPS2493EVM-004

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2493EVM-004 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS2493
  • Input Voltage: 12 V, 48 V
  • Output Voltage: 12 V, 48 V
  • Description/Function: The TPS2493EVM-004 is a fully assembled and tested circuit for evaluating the TPS2493 Positive High-Voltage Power-Limiting Hotswap Controller with Analog Current Monitor Output
  • Output Current: 1 A
  • Series: TPS2493
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.320005 oz

TPS2493EVM-004

TPS2493EVM-004 Specifications

TPS2493EVM-004 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Hot Swap Voltage Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 12 V, 48 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 12 V, 48 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 1 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.320005 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top