TPS2421-1EVM-02

Mfr. #: TPS2421-1EVM-02
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS2421-1 Hot Swap Controller Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS2421-1EVM-02 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2421-1EVM-02 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Hot Swap Voltage Controllers type. 12 V Input Voltage Output Voltage is 3 V to 18 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2421-1EVM-02 Image

TPS2421-1EVM-02

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2421-1EVM-02 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS2421
  • Input Voltage: 12 V
  • Output Voltage: 3 V to 18 V
  • Series: TPS2421
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2421-1EVM-02

TPS2421-1EVM-02 Specifications

TPS2421-1EVM-02 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Hot Swap Voltage Controllers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 12 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3 V to 18 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top