TPS2358EVM

Mfr. #: TPS2358EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS2358 Dual-Slot ATCA Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS2358EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2358EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Hot Swap Voltage Controllers type. 3.3 V, 12 V Input Voltage Dimensions of 117.6 mm x 152.4 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2358EVM Image

TPS2358EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2358EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS2358
  • Input Voltage: 3.3 V, 12 V
  • Dimensions: 117.6 mm x 152.4 mm
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2358EVM

TPS2358EVM Specifications

TPS2358EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Hot Swap Voltage Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 3.3 V, 12 V.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 117.6 mm x 152.4 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top