TPS22976EVM

Mfr. #: TPS22976EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools EVALUATION MODULE FOR THE TPS22976
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS22976EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22976EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 600 mV to 5.7 V Input Voltage Output current: 6 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS22976EVM Image

TPS22976EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22976EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: TPS22976
  • Input Voltage: 600 mV to 5.7 V
  • Description/Function: Evaluation module for TPS22976 load switch
  • Output Current: 6 A
  • Series: TPS22976
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS22976EVM

TPS22976EVM Specifications

TPS22976EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Power Distributions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 600 mV to 5.7 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 6 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top