TPS22965EVM-023

Mfr. #: TPS22965EVM-023
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS22965EVM EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS22965EVM-023 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22965EVM-023 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics Compatible with TPS22965. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.043522 oz of Unit Weight

TPS22965EVM-023 Image

TPS22965EVM-023

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22965EVM-023 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22965
  • Description/Function: Evaluation module helps designers evaluate the performance of the TPS22965 Ultra-Low rON, 6A Load Switch with Controlled Turn On
  • Series: TPS22965
  • Brand: Texas Instruments
  • For Use With: TPS22965
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.043522 oz

TPS22965EVM-023

TPS22965EVM-023 Specifications

TPS22965EVM-023 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Load Switches.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS22965.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.043522 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top