TPS22925EVM

Mfr. #: TPS22925EVM
Produttore: Texas Instruments
Descrizione: Power Management IC Development Tools TPS22925EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS22925EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22925EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 650 mV to 3.6 V Input Voltage Output Voltage is 650 mV to 3.6 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.060690 oz of Unit Weight

TPS22925EVM Image

TPS22925EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22925EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22925
  • Input Voltage: 650 mV to 3.6 V
  • Output Voltage: 650 mV to 3.6 V
  • Description/Function: Load switch evaluation module
  • Output Current: 3 A
  • Series: TPS22925
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.060690 oz

TPS22925EVM

TPS22925EVM Specifications

TPS22925EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 650 mV to 3.6 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 650 mV to 3.6 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 3 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.060690 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top