| Mfr. #: | TPA3250D2EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Audio IC Development Tools TPA3250D2EVM |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPA3250D2EVM Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 18 V to 38 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory The product's PurePath is Blue Gecko. 1. 2.153526 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3250D2EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Audio Amplifier.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 18 V to 38 V
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Audio IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Tradename?
Q: The product Tradename is PurePath.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 2.153526 oz.