TPA3221EVM

Mfr. #: TPA3221EVM
Produttore: Texas Instruments
Descrizione: Audio IC Development Tools TPA3221EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPA3221EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3221EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 12 V to 30 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.837748 oz of Unit Weight

TPA3221EVM Image

TPA3221EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3221EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3221
  • Operating Supply Voltage: 12 V to 30 V
  • Series: TPA3221
  • Brand: Texas Instruments
  • Operating Supply Current: 14 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.837748 oz

TPA3221EVM

TPA3221EVM Specifications

TPA3221EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 12 V to 30 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.837748 oz.

15 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top