TPA3106D1EVM

Mfr. #: TPA3106D1EVM
Produttore: Texas Instruments
Descrizione: Audio IC Development Tools TPA3106D1EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPA3106D1EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3106D1EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 10 V to 26 V operating supply voltage range Output power: 40 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3106D1EVM Image

TPA3106D1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3106D1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3106D1
  • Operating Supply Voltage: 10 V to 26 V
  • Output Power: 40 W
  • Series: TPA3106D1
  • Brand: Texas Instruments
  • Operating Supply Current: 4 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3106D1EVM

TPA3106D1EVM Specifications

TPA3106D1EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 10 V to 26 V.

  • A: Is the cutoff frequency of the product Output Power?

    Q: Yes, the product's Output Power is indeed 40 W

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top