| Mfr. #: | TPA3003D2EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Audio IC Development Tools TPA3003D2 Eval Mod |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPA3003D2EVM Scheda dati |


This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 8.5 V to 14 V operating supply voltage range Output power: 3 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3003D2EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Type of the product?
Q: The Type of the product is Audio Amplifier.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 8.5 V to 14 V.
A: Is the cutoff frequency of the product Output Power?
Q: Yes, the product's Output Power is indeed 3 W
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Audio IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.