TPA0102EVM

Mfr. #: TPA0102EVM
Produttore: Texas Instruments
Descrizione: Audio IC Development Tools 1.5W STEREO POWER AMP EVAL MODULE
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPA0102EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA0102EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA0102EVM Image

TPA0102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA0102EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA0102EVM

TPA0102EVM Specifications

TPA0102EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top