TMP102EVM

Mfr. #: TMP102EVM
Produttore: Texas Instruments
Descrizione: Temperature Sensor Development Tools TMP102EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TMP102EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP102EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Temperature Sensor type. 1.4 V to 3.6 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TMP102EVM Image

TMP102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP102EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Temperature Sensor
  • Tool Is For Evaluation Of: TMP102
  • Operating Supply Voltage: 1.4 V to 3.6 V
  • Series: TMP102
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TMP102EVM

TMP102EVM Specifications

TMP102EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Temperature Sensor

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 1.4 V to 3.6 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, USB

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Temperature Sensor Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top