TLV320AIC1103EVM

Mfr. #: TLV320AIC1103EVM
Produttore: Texas Instruments
Descrizione: Audio IC Development Tools TLV320AIC1103 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TLV320AIC1103EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV320AIC1103EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TLV320AIC1103EVM Image

TLV320AIC1103EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV320AIC1103EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio
  • Tool Is For Evaluation Of: TLV320AIC1103
  • Operating Supply Voltage: 3.3 V
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TLV320AIC1103EVM

TLV320AIC1103EVM Specifications

TLV320AIC1103EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top