TI-TUS5000EVM

Mfr. #: TI-TUS5000EVM
Produttore: Texas Instruments
Descrizione: Amplifier IC Development Tools Ultrasound Receive Chain Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TI-TUS5000EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TI-TUS5000EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

TI-TUS5000EVM Image

TI-TUS5000EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TI-TUS5000EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TI-TUS5000EVM

TI-TUS5000EVM Specifications

TI-TUS5000EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Amplifier IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top