THS6012EVM

Mfr. #: THS6012EVM
Produttore: Texas Instruments
Descrizione: Other Development Tools THS6012 Hi-Spd Amp Eval Mods
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: THS6012EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS6012EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Driver/Receiver type. Texas Instruments is a trusted brand for quality electronics 5 V to 15 V operating supply voltage range Other Development Tools product type 1 of 100 Development Tools as subcategory

THS6012EVM Image

THS6012EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS6012EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Other Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Driver/Receiver
  • Tool Is For Evaluation Of: THS6012
  • Series: THS6012
  • Brand: Texas Instruments
  • Operating Supply Voltage: 5 V to 15 V
  • Product Type: Other Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

THS6012EVM

THS6012EVM Specifications

THS6012EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Driver/Receiver.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V to 15 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Other Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top