THS4120EVM

Mfr. #: THS4120EVM
Produttore: Texas Instruments
Descrizione: Amplifier IC Development Tools THS4120 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: THS4120EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4120EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

THS4120EVM Image

THS4120EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4120EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: N
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

THS4120EVM

THS4120EVM Specifications

THS4120EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top