TCA8424EVM-038

Mfr. #: TCA8424EVM-038
Produttore: Texas Instruments
Descrizione: Interface Development Tools TCA8424 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TCA8424EVM-038 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TCA8424EVM-038 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the I2C type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Compatible with TCA8424. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. 1.65 V to 3.6 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TCA8424EVM-038 Image

TCA8424EVM-038

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TCA8424EVM-038 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: I2C
  • Tool Is For Evaluation Of: TCA8424
  • Description/Function: Low-voltage keyboard scanner that can support up to 128 keys
  • Series: TCA8424
  • Brand: Texas Instruments
  • Interface Type: I2C
  • For Use With: TCA8424
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Voltage: 1.65 V to 3.6 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TCA8424EVM-038

TCA8424EVM-038 Specifications

TCA8424EVM-038 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed I2C

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TCA8424

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.65 V to 3.6 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top