TAS5076-5182C6EVM

Mfr. #: TAS5076-5182C6EVM
Produttore: Texas Instruments
Descrizione: Audio IC Development Tools TAS5076-5182C6 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TAS5076-5182C6EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5076-5182C6EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS5076-5182C6EVM Image

TAS5076-5182C6EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5076-5182C6EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS5076PFC, TAS5182DCA
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS5076-5182C6EVM

TAS5076-5182C6EVM Specifications

TAS5076-5182C6EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top