| Mfr. #: | RF430F5978EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | RF Development Tools RF430F5978 Eval Mod |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | RF430F5978EVM Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the RF Transceivers type. Frequency range: 1 GHz 2.1 V to 3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with TPS62163, TPS62082. RF Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

RF430F5978EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Kits.
A: At what frequency does the Type?
Q: The product Type is RF Transceivers.
A: What is the Frequency of the product?
Q: The Frequency of the product is 1 GHz.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 2.1 V to 3 V
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed TPS62163, TPS62082
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed RF Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools