PGA302EVM-037

Mfr. #: PGA302EVM-037
Produttore: Texas Instruments
Descrizione: Pressure Sensor Development Tools PGA302EVM-037
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: PGA302EVM-037 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PGA302EVM-037 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Pressure Sensor type. 4.5 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Pressure Sensor Development Tools product type 1 of 100 Development Tools as subcategory

PGA302EVM-037 Image

PGA302EVM-037

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PGA302EVM-037 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Pressure Sensor Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Pressure Sensor
  • Tool Is For Evaluation Of: PGA302
  • Operating Supply Voltage: 4.5 V to 5.5 V
  • Series: PGA302
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Pressure Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PGA302EVM-037

PGA302EVM-037 Specifications

PGA302EVM-037 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Pressure Sensor.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 4.5 V to 5.5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Pressure Sensor Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top