OPA857EVM

Mfr. #: OPA857EVM
Produttore: Texas Instruments
Descrizione: Amplifier IC Development Tools OPA857 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: OPA857EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPA857EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Transimpedance / Switched Integrator type. 2.6 V to 3.6 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Compatible with OPA857. Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

OPA857EVM Image

OPA857EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPA857EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Transimpedance / Switched Integrator
  • Tool Is For Evaluation Of: OPA857
  • Operating Supply Voltage: 2.6 V to 3.6 V
  • Description/Function: Designed to quickly and easily demonstrate the functionality of the OPA857
  • Series: OPA857
  • Brand: Texas Instruments
  • For Use With: OPA857
  • Operating Supply Current: 25 mA
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

OPA857EVM

OPA857EVM Specifications

OPA857EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Transimpedance / Switched Integrator.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.6 V to 3.6 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is OPA857.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
Top