| Mfr. #: | MUX36S08EVM-PDK |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Switch IC Development Tools MUX36S08 EVM |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | MUX36S08EVM-PDK Scheda dati |


This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics 10 V to 36 V operating supply voltage range Switch IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MUX36S08EVM-PDK Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 10 V to 36 V.
A: What is the Product Type of the product?
Q: The Product Type of the product is Switch IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools