| Mfr. #: | MRD2EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | RFID Transponder Tools Microreader EVAL BRD |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | MRD2EVM Scheda dati |


This product is manufactured by Texas Instruments. Evaluation Kits 2.7 V to 5.5 V operating supply voltage range Frequency range: 134.2 kHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, RS232, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RFID Transponder Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MRD2EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Kits
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V to 5.5 V
A: What is the Frequency of the product?
Q: The Frequency of the product is 134.2 kHz.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is SPI, RS232, USB.
A: Is the cutoff frequency of the product Maximum Operating Temperature?
Q: Yes, the product's Maximum Operating Temperature is indeed + 85 C
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed RFID Transponder Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.